|
|||||||
|
|
|
|||||
|
|
|||||||
Forks re-fitted with new oil and seals. Front guard, kick start and rear springs in place, The rear wheel spokes have been tensioned. I am waiting on 4 new indicators and a new rear tyre, also a few more parts are still at the chrome shop.
The indicators only just arrived from the UK and as luck has It the tyre was also ready to pick up at the local bike shop so I took my rear wheel along with me and had the tyre fitted and wheel balanced. The picture above shows the rear wheel fitted as well as the indicators and chain guard. Side panels, tank and seat fitted even though I have not had the tank and sides re-sprayed yet (the paint damage is on the top of the tank so you will not see it in this picture).
All the electricals are now fitted and working, also handle bars, grips and levers. The front and rear brakes are now in place including all new seals for the front hydraulics and the rear brake rods re-galvanized and fitted. I have given in the last of the parts for re-chroming including the front wheel and gear lever. I have also given the petrol tank and side panels in for a respray and the new decals to be fitted, the only part which I did not give in for re-chroming is the exhaust system as the cost of re-chroming it is not much less than an original complete new system so I am going to order a new one